|
Post by mulv on Jun 3, 2024 18:54:08 GMT
Not the pop group 😁
During lockdown v1.0 we decided to renew our patio. It was made of badly-laid concrete slabs which were disintegrating and coming loose. The rebuild made the step from the patio down to the lower garden much higher (450mm, or 18" if you prefer) so I piled up some slabs as a temporary step.
"Temporary" is a very elastic term 😁
I've finally got round to building some proper steps, and I'm dead pleased with them. Wooden sleepers on a concrete base, infilled with rubble and stones from the garden and topped off with decorative gravel. It's taken me two days (supervised by Jayne from her sick-chair) and I'm knackered, but well pleased with the result.
|
|
|
Steps
Jun 4, 2024 16:54:15 GMT
via mobile
Post by Su on Jun 4, 2024 16:54:15 GMT
Look great on FB
|
|